Our website uses cookies to better meet your requirements. Proper configuration of browser options allows you to block or remove cookies but can also cause the site to not function properly or even at all. By continuing to use the site, with no change to your browser settings, you agree to the use of cookies.
Learn about our Privacy Policy for cookies and other similar technologies.

China Resource Centre (CRC) (ENG)

Delivering optimum indoor climate with trouble free operation for a high profile new development.

The challenge

China Resource Centre (CRC), the new headquarters of China Resource Company, has several different buildings with a total area of 400,000m2. The development, located in Shenzhen, is multi use and includes a shopping centre, a 6 star hotel, an office building and luxurious residential apartments.

Aiming for the highest standards in quality, the customer needed a partner to deliver a perfect indoor climate solution with trouble-free operation.

The solution

In the early project phase, the IMI Indoor Climate China team provided seminars for the designers and consultants involved, addressing project specific requirements. This succeeded in creating an appreciation for the importance of total hydronic balancing.

The close cooperation with designers and consultants and continuous support from design to construction phase, enabled the IMI Indoor Climate China team to deliver a balancing solution using manual balancing valves, providing the optimum indoor climate. In addition to the design support, the team also provided commissioning services to ensure all the valves were set up correctly. Dedication and know-how during this final commissioning phase before the opening of the building, ensured optimal system operation from the very beginning and the system continues to perform as desired by CRC and its tenants.